Array ( [0] => Array ( [meta_title] => St. Mary Bridge Removal [meta_description] => St. Mary Bridge Removal | Davis Erection Company, Inc. [meta_keywords] => St. Mary Bridge Removal, Davis Erection Company, Inc. [meta_h1] => [meta_h2] => [meta_robots] => noindex,nofollow [meta_twitter_account] => @ [meta_summary] => St. Mary Bridge Removal | Davis Erection Company, Inc. [meta_image] => http://www.daviserection.com/ [meta_canon] => http://www.daviserection.com/projects/details/st.-mary-bridge-removal [theme_color] => ) ) St. Mary Bridge Removal | Projects | Davis Erection Company, Inc.

Projects

Omaha, Nebraska

St. Mary Bridge Removal

College of Saint Mary bridge removal and relocation
The Weitz Company - General Contractor

163 foot long pedestrian bridge, and 53,000 lbs

500 ton crane with 132 foot radius 
90 ton assist crane

PREVIOUS PAGE